Welcome to the official website of Yancheng Oujie Machinery Co., Ltd!

consultation telephone:

+86 151 0511 6300

轻型管夹,重型管夹,双联管夹
Your current location : Home >> News >> Industry information

ContactContact Us

Yancheng Oujie Machinery Co., Ltd

Contacts:Eric

Telephone:+86 515-87226455

Mobile phone:+86 1510 511 6300

Fax:0515-87226455

Whatsapp:+86 15105116300

Mailbox:arli@qq.com

Address:No. 18, Avenue, development zone, Funing County, Yancheng City

Website:en.ycojjx.com

Heavy pipe clamp manufacturer: how to install plastic pipe clamp?

2021-09-03 11:35:08
Times

Heavy pipe clamp manufacturer: how to install plastic pipe clamp?
Installation of plastic pipe clamp.
Pipe clamps are fixed as system pipes (usually called saddle clamps). In business, pipelines used for ground fixing (please note that geothermal ground operation or location data with pipelines on the ground can not be fixed by drilling) should also be raised and fixed before they are straight.
Before assembling the welding plate, determine the direction of the plastic pipe clamp.
For the ground horizontal guide rail, the guide rail can be welded on the foundation under construction or not fixed with screws. Then push the guide rail nut into the guide rail and rotate it 90 degrees. Insert the lower half of the pipe clamp into the nut to fix the pipe required by the enterprise. It is fixed on the upper half of the plastic pipe clamp mounting body and the cover plate with screws.
Stacking: the guide rail can be welded on the base or fixed with screws. First install the lower half of the pipe clamp body, then install the upper half of the pipe clamp body, and then fix it with screws. The lock cover is prevented from turning. Other pipe clamps can also be installed as above.
Elbow assembly: elbow assembly. It should be fixed directly to the front and back of the elbow with caster clamps. For enterprises, this support should be established.
Therefore, there is no difference between pipe clamp and pipe clamp. Except for different product names, their usage is the same. They let him handle the clip and the card.
Install the plastic pipe collet.
Before installing it on the welding plate, in order to better determine the clamping direction, it is recommended to mark the fixed position first, then weld, and place the lower half of the embedded pipe clamp on the pipe to be fixed. Then place the other half of the pipe clamp body and the cover plate and fasten them with screws. Do not directly weld the base plate with pipe clamps installed.
Plastic pipe clamp manufacturer
On the ground guide rail, the guide rail can be welded on the base or fixed with screws, then push the guide rail nut into the rail, turn 90 degrees, insert the lower half of the pipe clamp body into the nut, put the pipe to be fixed, and then put the upper half of the pipe clamp cover and fix it with screws.
For stacking, the guide rail can be welded on the base or fixed with screws. First install the upper and lower half of the pipe clamp body, put the upper half of the pipe clamp to be fixed, fix it with screws, and prevent it from rotating through the anti loosening cover. Install two more pipe clamps in the same way as above.
When assembling and installing the elbow, the front and rear ends of the elbow shall be directly fixed in front and back of the elbow. It is recommended that this support point should be fixed.

Tags

0

底部logo2.png

24-Hour Hour Hotline

+86 151-0511-6300

Contacts:Eric

Telephone:0515-87226455

Fax:0515-87226455

Whatsapp:+86 15105116300

Mailbox:arli@qq.com

Address:No. 18, Avenue, development zone, Funing County, Yancheng City

Wechat QR code

copyright @Yancheng Oujie Machinery Co., Ltd Filing No.: 苏ICP备2020055040号-1