Type analysis and manufacturing process of aluminum alloy pipe clamp

2021-05-08 16:00:29
Times

Type analysis and manufacturing process of aluminum alloy pipe clamp
Plastic pipe clamp: each manufacturer must be equipped with Dake injection molding machine, stamping machine, CNC machine tool and forging equipment. The plastic pipe clamp on the home page is divided into plastic lifting, upper and lower covers and screw covers. The plastic body is injected according to different models required by customers, and the appearance should be smooth. The drawing, hardness and aging resistance of the selected plastic particles must be strong. The upper and lower covers are stamped by stamping machine and then galvanized, The screws are stamped by CNC machine tool, then galvanized, and then the pipe clamp is integrated and packaged by technicians.
Aluminum alloy pipe clamp: aluminum alloy pipe clamp is basically the same as plastic pipe clamp. The main pipe clamp body is made of aluminum alloy, so the selected equipment is mainly made of aluminum alloy injection machine.
U-shaped pipe clamp: the main equipment used is forging press and CNC machine tool equipment. First, high-quality carbon steel shall be selected. After baking to a certain extent, it shall be pressed and bent into U-shape by forging press, and then galvanized.
Transformer clamp: the same as U-shaped clamp.

Aluminum pipe clamps are widely used and widely used in many industries. Many pipe clamp installers operate nonstandard, resulting in many problems in later installation. Let me introduce the matters needing attention in pipe clamp installation, mainly including the following points:
Before assembling the welding plate, in order to better determine the direction of the collet, it is recommended to fix the collet before welding. The lower half of the collet is a collet embedded with the pipe, and the collet is placed where the pipe needs to be fixed. Then put on the other half of the pipe clamp body and the cover plate and tighten it with screws. Do not directly weld the base plate with aluminum alloy pipe clamp installed.
When installing the ground guide rail, the guide rail can be welded on the foundation or fixed with screws, then push the guide rail nut into the rail, rotate 90 degrees, insert the lower half of the pipe clamp body into the nut, fix the pipe to be fixed, and then fix the upper half of the pipe clamp body and the cover plate with screws.
For lamination assembly, the guide rail can be welded on the foundation or fixed with screws. First install the upper and lower half of the pipe clamp body, and then install the upper half of the pipe clamp body after the pipe clamp body is fixed. Fix it with screws and prevent it from rotating through the anti loosening cover. The installation method of the second pipe clamp is the same as above.

Tags

0

底部logo2.png

24-Hour Hour Hotline

+86 151-0511-6300

Contacts:Eric

Telephone:0515-87226455

Fax:0515-87226455

Whatsapp:+86 15105116300

Mailbox:arli@qq.com

Address:No. 18, Avenue, development zone, Funing County, Yancheng City

Wechat QR code

copyright @Yancheng Oujie Machinery Co., Ltd Filing No.: 苏ICP备2020055040号-1