Welcome to the official website of Yancheng Oujie Machinery Co., Ltd!

consultation telephone:

+86 151 0511 6300

轻型管夹,重型管夹,双联管夹
Your current location : Home >> News >> Industry information

ContactContact Us

Yancheng Oujie Machinery Co., Ltd

Contacts:Eric

Telephone:+86 515-87226455

Mobile phone:+86 1510 511 6300

Fax:0515-87226455

Whatsapp:+86 15105116300

Mailbox:arli@qq.com

Address:No. 18, Avenue, development zone, Funing County, Yancheng City

Website:en.ycojjx.com

The manufacturer of heavy pipe clamp introduces the scope of application of pipe clamp!

2020-09-17 10:15:11
Times

The manufacturer of heavy pipe clamp introduces the scope of application of pipe clamp!
We all know that pipe clamps have the characteristics of density, bending strength, impact toughness, compressive strength, elastic modulus, tensile strength, temperature resistance and color. They are mainly used in the following ranges:
Light pipe clamps are used for ordinary mechanical pressure pipes of 6 size series, with an outer diameter of 6-57mm.
Double pipe clamps are used for mechanical pressure pipes of 5 size series, with an outer diameter of 6-42mm.
The heavy pipe clamp is used for high mechanical pressure pipes of 8 size series, with an outer diameter of 8-273mm.

重型塑料管夹厂

The following aluminum alloy pipe clamp manufacturers and everyone mainly come to understand its installation procedure
Before assembly on the welding plate, in order to better determine the direction of the clamp, it is recommended to mark the fixed position first, then weld, insert the lower half of the pipe clamp body, and place the pipe to be fixed. Then put on the other half of the pipe clamp body and the cover plate and tighten it with screws. Do not directly weld the bottom plate with pipe clamp installed.
Install the guide rail on the ground. The guide rail can be welded on the foundation or fixed with screws. Then push the guide rail nut into the rail and turn it 90 degrees. Insert the lower half of the pipe clamp body into the nut, put the pipe to be fixed, and then put the upper half of the pipe clamp body and cover plate, which are fixed with screws.
For stacking assembly, the guide rail can be welded on the foundation or fixed with screws. First install the upper and lower half of the pipe clamp body, put the pipe to be fixed, and then put the upper half of the pipe clamp body, fixed with screws, and prevent it from rotating through the anti loosening cover plate. Then install the two pipe clamps in the same way as above.
For the assembly of elbow, when assembling the elbow, it shall be directly fixed with pipe clamps at the front and rear of the elbow. It is recommended that such support points should be fixed.

Tags

0

底部logo2.png

24-Hour Hour Hotline

+86 151-0511-6300

Contacts:Eric

Telephone:0515-87226455

Fax:0515-87226455

Whatsapp:+86 15105116300

Mailbox:arli@qq.com

Address:No. 18, Avenue, development zone, Funing County, Yancheng City

Wechat QR code

copyright @Yancheng Oujie Machinery Co., Ltd Filing No.: 苏ICP备2020055040号-1